PIPELINE DIVISION

https://www.icon-og.com/wp-content/uploads/2022/01/Untitled-2-1.gif
ONSHORE PIPELINE
Clearing the ROW as needed and ditching
Stringing pipe joints along the ROW.
Welding the pipe joints together and applying a coating and wrapping the exterior of the pipe (excepte for the portions of the pipe at each end, which is sometimes coated before being delivered to the job site).
Lowering the pipeline into the ditch and backfilling the ditch.
Testing the line for leaks
Cleanup and drying the pipeline after testing to prepare it for operation.
Reclaiming impacted environmental areas.
CONSTRUCTION PROGRAMME
Pre-construction activities inclouding setting up of temporary construction compounds and facilities.
Mobilization and reparation of temporary working areas.
Tunneling and construction of stone road in peatland areas.
Installation of the onshore Gas pipeline (and associated services) & testing.
Grouting of tunnel & Commissioning and Reinstatement